Skip to content

OCPP waiting list

We’ll build it once 50 locations take part.

Ladehase should work with every charging station that speaks OCPP. This connection is a lot of work, so we’ll only build it once 50 locations really want to use it. Sign up, it costs nothing and doesn’t commit you to anything.

Current status

1 / 50 locations

49 more to go until launch. Deadline: 30 April 2027.

Only locations with a confirmed email address count. Several charge points at the same place count as one location. If we don’t reach 50 by 30 April 2027, we’ll drop it and let you know.

Why a waiting list?

So that guests can only charge after paying, Ladehase has to lock and unlock the charging station. The approach that works with the most brands is called OCPP. For this we run our own server, which every charging station stays connected to at all times.

That’s several weeks of work, followed by ongoing responsibility for running it. We don’t want to build it on spec. If 50 locations tell us they need it, we know it’s worth it.

Until then, Ladehase isn’t in live use at any charging station. We’d rather say so openly than promise something that isn’t running yet.

What’s already built

  • Payment page for TWINT, Visa, Mastercard, PF Pay, Apple Pay and Google Pay
  • Dashboard for operators with locations, tariffs, access and reports
  • QR signs, receipts and billing per charge
  • Connection to zahls.ch and Freika, the money goes straight to your account

What’s still missing

  • OCPP server that locks charging stations, unlocks them after payment and measures the energy
  • Testing with real charging stations from the brands on the waiting list
  • Live testing of payments with the first locations

If 50 locations sign up

  • Launch within 3 months

    From the day location number 50 is confirmed, we’ll build the connection and go live within 3 months. You’ll get a short update by email every month.

  • We test together on your devices

    Before opening it to everyone, we test with people on the list who want to take part, on their own charging stations. That way it works for you before the first guests arrive.

  • Free A4 signs

    All 50 locations get the A4 aluminium signs with their QR code for free.

  • You help decide the order

    We’ll implement the brands with the most sign-ups first. The ranking below is public and shows the current status.

If there aren’t enough

  • If we don’t reach 50 locations by 30 April 2027, we’ll write to everyone on the list to explain what happens next.
  • We’ll delete your details unless you explicitly want to stay informed.
  • In no case will you incur any costs or obligations.

Brand ranking

Confirmed locations per manufacturer. We’ll implement the brands at the top first.

  1. 1Easee1 location

Add your location

One entry per location. After submitting, you’ll get an email. Your location only counts once you confirm it.

1 / 50 locations

49 more to go until launch. Deadline: 30 April 2027.

Your charging station
About you

We only use your details for the waiting list and delete them if the project doesn’t go ahead. More in our privacy policy.

34 compatible charging stations

These models speak OCPP, so they can be locked and unlocked after payment. On each model page you’ll find the details and can sign up directly.

See all manufacturers

Frequently asked questions about the waiting list